Infrastructure in Navenna: Difference between revisions
Basic structure. Beginning of table of motorways. |
m Setting categories |
||
| Line 95: | Line 95: | ||
== Air transport == | == Air transport == | ||
=== Airports === | === Airports === | ||
[[Category:Navenna]] | |||
[[Category:Infrastructures]] | |||
Revision as of 22:15, 29 September 2024
Because of the country's location at the Mesembric Ocean and long coastline, Navenna has well developed maritime infrastructure for the transportation of passengers and goods.
Road transport
Autostrade
All motorways are tolled, with the exception of a few short sections around the City of Navenna where the A-1 and A-5 terminate.
Due to the country's small size, few motorway route numbers are actually in use. The route numbers 1-5 are used for motorways in the vicinity of the City of Navenna and are arranged in a rough radial system. Many route numbers are reserved for hypothetical routes that have planned itineraries but lack any traffic demand to justify their construction. Spur routes are numbered based on which trunk routes they connect. Only one such spur exists, A-51, which is numbered so due to connecting A-1 with A-5. The A-13 is about the same length but is part of a longer planned route and thus not considered a spur.
| Route number | Route names | Itinerary (south/west to north/east) |
Length (km) | Status | Notes |
|---|---|---|---|---|---|
Autostrada 1∈⊾ |
Autostrada del Cuòr (section Navenna-Ƚovana)
Autostrada del Nord (section Ƚovana-Gianela) |
City of Navenna ⭢ ⌘ N-400 ⭖ I ⭢ ⌘ A-51 ⭖ II ⭢ ⌘ N-4 ⭖ Malghexè ⭢ ⌘ A-3 ⭢ ⌘ N-36 ⭢ Zsiana ⭢ ⌘ N-300 ⭖ Ƚovana ⭢ Breselo ⭢ ⌘ N-14 Meletta ⭢ to |
167 | Completed | The section of A-1 between Guinixa and Malghexè is the oldest motorway in Navenna and opened in 1943. The same section is also the busiest road in the country with an AADT of 65,740 measured in 2022 just north of the A-1/A-61 interchange. |
Autostrada 3∈⊾ |
Autostrada ƚ'Arasana | ⌘ A-1 ⭢ Malghexè ⭢ Paramo ⭢ ⌘ N-12 ⭢ to |
62 | Completed | - |
Autostrada 4∈⊾ |
Partially open, planned | ||||
Autostrada 5∈⊾ |
Completed | Longest motorway route in Navenna. | |||
Autostrada 7∈⊾ |
Completed | ||||
Autostrada 12∈⊾ |
16 | Partially open, planned | |||
⭖ II Autostrada 51∈⊾ |
Segónda Periferia de Navenna | 11 | Partially open, under construction | Runs concurrent with City of Navenna's second bypass road. Eastern half between the A-5 and N-2 is completed. Western half is currently under construction and will connect the A-51 with the N-1 east of Maranóva. |